Wind turbines on Maasvlakte 2 beach

Determining morphological effects to facilitate the Dutch public tender

In 2019 Directorate-General for Public Works and Water Management (Rijkswaterstaat) has started a tendering procedure for the construction and exploitation..

Tidal outlet Killetje

Monitoring campaign bottom protection on both sides of the tidal outlet

Waterdunen project creates a nature and recreation area, in which the tide determines the natural value. Due to the constant..

Wave conditions port of Hansweert

Construct hydraulic database with 'HB-Havens'

Databases with wave conditions are available for the Western Scheldt Estuary; the so-called hydraulic boundary conditions (HR). In these databases,..

Detailed modelling Brienenoord Island

Hydrodynamical effect study and morphological analysis

The municipality of Rotterdam will (further) develop parts of Brienenoord Island as a nature reserve on behalf of Rijkswaterstaat and..

Wave conditions IJmuiden harbour

Application HARES within HB-Havens software

To determine the wave conditions (hydraulic boundary conditions) of the Dutch primary water defences inside harbours Rijkswaterstaat has developed the..