• Wave climate study Port of Scheveningen

    For the third harbour basin of Scheveningen, plans are in development for the realisation of a housing project in the former Norfolk area ...

    read more
  • Borssele Wind Farm

    TenneT TSO is responsible for the installation of the power cables, connecting the Borssele Wind Farm locations to the main land ...

    read more
  • Borssele wind farm cable

    To connect Borssele Wind Farm to the shore power grid four AC export cables will be laid through the Western Scheldt estuary and ...

    read more
  • Colombo Port City

    The Colombo Port City Development is a large 200 hectare land reclamation. Once finished it will be protected by a low-crested ...

    read more
  • COBRA cable

    The COBRA HVDC cable is to connect the Dutch grid at Eemshaven with the Danish grid at Endrup. It will be installed ...

    read more
  • Mega Cruise Pier II, Curacao

    Curaçao Ports Authority (CPA) plans to construct a second jetty, called the Mega Cruise Pier II, near shore at Otrobanda ...

    read more
  • Weak Link Cadzand-Bad

    The West Zeeuws-Vlaanderen weak link runs from Breskens to the Zwin. It’s such a large area, the weak link is split into ...

    read more
  • Design Coastal Protection Scheme Marsalforn Bay, Malta

    Hotels and other developments at Marsalforn (Gozo) experience significant wave overtopping during storm events, the most ...

    read more
  • Sedimentation Study Lomé, Togo

    Lomé Container Terminal had requested Svašek Hydraulics to study the sedimentation along the coastline and the impact ...

    read more
  • Delimara power station, Malta

    For the development of LNG facilities at Delimara Power Station a study of currents and penetration of waves in Marsaxlokk Bay ...

    read more