A statistical risk assessment of damage of tunnel one of the elements by wave action during the transport on the North Sea from Flushing to IJmuiden.
read moreMobil Producing Nigeria Unlimited has planned an NGL export terminal on the left bank of Bonny River. The project included..
read moreWAQUA simulations of high water discharge in the Pannerdensch Kanaal with Dutch Rhine branches numerical model.
read moreDetermination of coastal defense in the short, medium and long term in order to reduce the immediate flood risks.
read moreSet up a current model (FINEL) and after validation supply online current forecasts.
read moreDetermine hydraulic boundary conditions and design armour layer of dike.
read moreBathymetric Survey of Oti River. In 40 days 606 km of the river was surveyed.
read moreHARES study to investigate effectiveness various marina expansion locations with use of floating breakwaters.
read more