OSO NGL Recovery Project Bonny River Terminal

Services:
Field surveys, hydraulic design of marine facilities

Client:
Mobil Producing Nigeria Unlimited and Bouygues Offshore

Location:
Bonny River, Nigeria

Date:
1995 - 1997
The recovery of NGL from the OSO oil and gas fields in Nigeria requires among others the construction of an export terminal in Bonny River between Bonny Town and the ocean corner. The terminal includes the construction of a loading jetty for large NGL carriers and a small boat dock inside Finima Creek with access to the river. The marine facilities were designed in 1995 and completed in 1997.
The following services were provided:
- hydrographic surveys (topography, bathymetry, currents, waves, sediments)
- 2D numerical modelling of currents, waves and sediment transport (FINEL)
- satellite imagery analysis on shoreline development
- analysis of maintenance dredging volumes
- determination of mooring loads (TERMSIM)
- evaluation of navigational procedures
- optimisation of lay out of marine structures
Bastiaan Les
Projectleader

MORE INFORMATION ABOUT SVAŠEK OR OUR EXPERTISES?
Please contact us or make an appointment.
CONTACT US