Nigeria LNG export terminal

Services:
Hydrographic surveys, Hydraulic design of marine facilities
Client:
Nigeria LNG (joint venture of NNPC and Shell)
Location:
Bonny River, Nigeria
Date:
1996 – 1998

For the export of gas, Nigeria LNG has developed a terminal on the left bank of Bonny River between Bonny Town and the ocean corner. The works include a loading jetty for large LNG-carriers and a jetty for material off loading, tug boats and passenger ferries in Bonny River.

The facilities were designed in 1996 and completed in 1998. In 2001 the facilities were extended by a second LNG loading jetty.

The following services were provided:
• Hydrographic surveys (topography, bathymetry, currents, waves, sediments)
• 2D numerical modelling of currents, waves and sediment transport (FINEL)
• Satellite imagery analysis on shoreline development
• Analysis of maintenance dredging volumes
• Determination of mooring loads (TERMSIM)
• Evaluation of navigational procedures
• Optimisation of lay out of marine structures

MORE INFORMATION?

Please contact Bastiaan Les.

Bastiaan Les

Projectleader

MORE INFORMATION ABOUT SVAŠEK OR OUR EXPERTISES?

Please contact us or make an appointment.

CONTACT US