{"id":4872,"date":"2000-10-24T10:13:01","date_gmt":"2000-10-24T10:13:01","guid":{"rendered":"https:\/\/www.svasek.nl\/project\/optimisation-connection-lek-channel-to-the-river-lek\/"},"modified":"2023-10-24T10:20:57","modified_gmt":"2023-10-24T10:20:57","slug":"optimisation-connection-lek-channel-to-the-river-lek","status":"publish","type":"project","link":"https:\/\/www.svasek.nl\/en\/project\/optimisation-connection-lek-channel-to-the-river-lek\/","title":{"rendered":"Optimisation connection Lek channel to the River Lek"},"content":{"rendered":"<p>To improve the connection of the Lek canal to the River Lek the hydraulic and morphological effects of several alternative..<\/p>\n","protected":false},"featured_media":4867,"template":"","tags":[],"project_category":[22,27,21,35],"class_list":["post-4872","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-currents-en","project_category-finel-en","project_category-morphology-en","project_category-waqua-en"],"acf":{"download_pdf_button":"","download_pdf_button_en":"","project_info":{"left":{"diensten":"Development WAQUA and FINEL model of Lek area, morphological study, hydraulic study.","opdrachtgever":"Rijkswaterstaat","locatie":"Connection of the Lek channel to the River Lek, near the city of Nieuwengein.","datum":"2000"},"right":{"google_map":{"address":"233X+7X Nieuwegein, Netherlands","lat":52.00315792219181,"lng":5.099944091015636,"zoom":12,"place_id":"GhIJrZxiemcASkARbrYDv1dmFEA","city":"Nieuwegein","state":"Utrecht","state_short":"UT","country":"Netherlands","country_short":"NL"}}},"content":{"title":"","text":"To improve the connection of the Lek canal to the River Lek the hydraulic and morphological effects of several alternative junctions were investigated by Sva\u0161ek Hydraulics. For the modelling of the hydraulic effects two different 2DH models were used: WAQUA and FINEL.\r\n\r\nBoth models were calibrated using ADCP current measurements in several lines across and parallel to the river. FINEL\u00a0showed better results and was further used as the design tool for the hydraulic design.\r\n\r\nThe hydraulic design comprises the development of eddies in the entrance of the Lek cannel and the impact of these eddies on the maintenance dredging volumes.\r\n\r\nBesides the hydraulic study a morphological study was executed to determine the impact of the several junction configurations on the river bed."},"slider":[{"image":4871,"video":""},{"image":4869,"video":""},{"image":4867,"video":""}],"expert_guy":{"left":{"title":"MORE INFORMATION?","content":"Please contact Sam Bom.","linkedin_link":"https:\/\/www.linkedin.com\/in\/sambom\/","email":"bom@svasek.nl"},"right":{"title":"Sam Bom","designation":"Projectleader","photo":1307}},"cta":{"title":"MORE INFORMATION ABOUT SVA\u0160EK OR OUR EXPERTISES?","text":"Please contact us or make an appointment.","link":{"title":"CONTACT US","url":"https:\/\/www.svasek.nl\/en\/contact\/","target":""}},"custom_links":{"linked_url":""},"hide":""},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.svasek.nl\/en\/wp-json\/wp\/v2\/project\/4872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.svasek.nl\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.svasek.nl\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.svasek.nl\/en\/wp-json\/wp\/v2\/media\/4867"}],"wp:attachment":[{"href":"https:\/\/www.svasek.nl\/en\/wp-json\/wp\/v2\/media?parent=4872"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.svasek.nl\/en\/wp-json\/wp\/v2\/tags?post=4872"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.svasek.nl\/en\/wp-json\/wp\/v2\/project_category?post=4872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}